A Shufflebottom steel-framed building, 26m by 17.5m and 6m to
the eaves, at Chevron's oil refinery in Pembroke, Wales, was
constructed in 2010. In addition, Shufflebottom added a
steel-framed extension, 18m by 6m, to an existing building at the
refinery. The new building incorporates the Shufflebottom
galvanised eaves beam gutter system.