Green Recycling's waste centre on Quayside Industrial Park, Maldon, Essex, expanded in length in 2012. A Shufflebottom steel-frame extension 45.3m long and 15.3m wide continued the pre-existing building. 

Pre-cast concrete panels, 3m high except for three that are a metre high, line four bays of the boundary wall and four bays of the front elevation. The gable elevation has concrete panels to a height of 4m, except for four that are 1m high.  

Ref: E10457

 

2012 Green Recycling Maldon

There are 3-phase operated roller shutter doors 6.28m wide and 7.5m high, and two personnel doors. Side cladding on the rear wall, to 8.25m below the eaves, is 40mm Kingspan KS1000RW composite sheeting. Two elevations have 1000/32 single-skin cladding.  

On the roof, there is 0.7mm Plastisol-coated single-skin box profile, with rooflights on both slopes.  

Spill plate flashings are on top of the concrete panels to cover the void between the outside of the cladding and the internal face of the panels. 